We have implemented the process of determining the required resources. <br>Determine resources include: qualified personnel, budget, infrastructure, such as: construction, testing and inspection equipment (hardware and software), laboratory equipment, machinery, and equipment. <br>For manufacturing prototypes, manufacturing prototype, pre-production, capacity and specific detection achieve the desired performance and mass, it must be planned. <br>Should be based on a project to change the situation and possible bottlenecks, resource planning to be adjusted on a regular basis.
正在翻译中..