Conditions for motor commissioning<br>The construction work is basically completed, and the site cleaning and finishing is complete;<br>Installation works related to the motor test operation have been completed, power cabinets, distribution cabinets installed wiring is complete, quality inspection is qualified, commissioning has been completed, and with the power, feed conditions;<br>Motor and equipment installation is completed, quality inspection is qualified, the period of grouting maintenance has arrived;<br>The motor and equipment control cabinet installation wiring is complete, the circuit debugging is complete, the simulation action is correct and reliable;<br>The insulation resistance test of the motor conforms to the specification requirements;<br>The working group has been set up, the division of labor is clear, testing tools, instruments, records, contact tools have been completed technical and safety bottom, security work has been implemented.<br>Steps and requirements for motor commissioning<br>The position of machine test operation must be protected (fence, warning sign, debugging personnel must wear reflective vest);<br>Bolts of couplings that separate the motor from the machine (no demolition or no exception suffit).<br>The claw should be flexible, no card block phenomenon;<br>The motor or the machinery required by the fixed direction of the tow belt must first test the phase sequence of the power supply, and the wiring is consistent with the rotation direction requirements;<br>Cabinet is charged, check the three-phase voltage, such as normal then close the motor circuit power supply, start the motor, determine the direction of motor rotation, and observe the instantaneous operation;<br>When started, measure the three-phase start current.<br>The three-phase current should be balanced;<br>After normal operation, measuring the motor airborne current, should maintain balance, the temperature of the motor, vibration, noise no more than the prescribed, the motor air transport behavior for 2 hours;<br>Do a good job of trial run records: every half hour to carry out a current, temperature, voltage, vibration and other checks;<br>At the end of operation, the couplings are restored for commissioning under different load and full load conditions.<br>Different devices are required according to technical documentation.<br>Quality assurance measures<br>The foot bolts are oiled to prevent rust, preventing the ground foot bolts from bending or damaged by the wire buckle: the foot bolts are covered with a plastic sheet after touching butter.<br>Pad iron arrangement, pad iron specifications in line with the specification requirements: pad iron according to the specification of the arrangement, pad iron machine processing.<br>When the equipment is grouted, the mortar dripping on the surface of the equipment is cleaned in time and the surface of the equipment is kept clean.<br>Improve the awareness of the whole staff on the protection of finished products, to prevent bumping, smashing, arc scratching and pollution of the surface of equipment.<br>Security
正在翻译中..