1. Hand over the electronic balance to the meter for repair.<br>2. If the repair is not good, you need to initiate the change and purchase a new electronic balance replacement number A-FM01-Y33-03 electronic balance.<br>3. The isolation device cleaning operating procedure (H3-SOP-20041) is upgraded, in the "isolator dry, can the electronic balance and sealer back to the original place of the isolator" description changed to "after the isolator dry, the need to use both hands to move the electronic balance and sealer back to the original isolator." ”<br>4. All refined personnel in the 103 workshop for the isolation cleaning operating procedures (H3-SOP-20041) after the upgrade training: emphasis on the transfer of electronic days, must be two-handed operation, to ensure that the electronic balance grasp, and then transfer operations.
正在翻译中..