1.将电子天平交给计量进行维修。2.如果维修不好,则需启动变更,购买新的电子天平替换编号A-FM01-Y33-03电子天平。3.对隔离器清洗的英语翻译

1.将电子天平交给计量进行维修。2.如果维修不好,则需启动变更,购买新

1.将电子天平交给计量进行维修。2.如果维修不好,则需启动变更,购买新的电子天平替换编号A-FM01-Y33-03电子天平。3.对隔离器清洗操作规程(H3-SOP-20041)进行升版,在“隔离器干燥后,方可将电子天平和封口机移回隔离器的原处”描述中更改为“隔离器干燥后,需要用双手操作将电子天平和封口机移回隔离器的原处。”4.对103车间所有精制人员进行隔离器清洗操作规程(H3-SOP-20041)升版后培训:强调在转移电子天平时,须双手操作,确保将电子天平抓稳抓牢,再进行转移操作。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1. Submit the electronic balance to the meter for repair. <br>2. If the repair is not good, you need to start the change and buy a new electronic balance to replace the electronic balance number A-FM01-Y33-03. <br>3. Upgrade the operating procedure for isolator cleaning (H3-SOP-20041), and change the description of "Isolator drying before moving the electronic balance and sealer back to the original isolator" description Afterwards, it is necessary to use both hands to move the electronic balance and the sealing machine back to the original place of the isolator." <br>4. All refined personnel in the 103 workshop shall be trained after the upgraded version of the isolator cleaning operation procedure (H3-SOP-20041): Emphasize on transferring When using an electronic balance, you must operate it with both hands to ensure that the electronic balance is firmly grasped before transferring.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1. Hand over the electronic balance to the meter for repair.<br>2. If the repair is not good, you need to initiate the change and purchase a new electronic balance replacement number A-FM01-Y33-03 electronic balance.<br>3. The isolation device cleaning operating procedure (H3-SOP-20041) is upgraded, in the "isolator dry, can the electronic balance and sealer back to the original place of the isolator" description changed to "after the isolator dry, the need to use both hands to move the electronic balance and sealer back to the original isolator." ”<br>4. All refined personnel in the 103 workshop for the isolation cleaning operating procedures (H3-SOP-20041) after the upgrade training: emphasis on the transfer of electronic days, must be two-handed operation, to ensure that the electronic balance grasp, and then transfer operations.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. Hand over the electronic balance to Metrology Department for maintenance.<br>2. If the maintenance is not good, it is necessary to start the change and purchase a new electronic balance to replace the electronic balance No. a-fm01-y33-03.<br>3. Upgrade the operation procedure for isolator cleaning (h3-sop-20041), and change the description of "after the isolator is dry, move the electronic balance and sealing machine back to the original place of the isolator" to "after the isolator is dry, move the electronic balance and sealing machine back to the original place of the isolator with two hands."<br>4. All refining personnel in 103 workshop were trained after upgrading the operating procedures for isolator cleaning (h3-sop-20041): it was emphasized that when transferring the electronic balance, it should be operated with both hands to ensure that the electronic balance was firmly grasped before transferring.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: