The determination of the total set transmission process of this scheme is based on the comprehensive situation of this gas field, learn from the other coal seam gas ground collection and transmission process, analyze the total process of various low-yielding low-yield low-voltage coal seam gas fields, after repeated demonstration, simplification and optimization, and finally determine the use of "shard collection, multi-well low-pressure gas collection, single-well simple metering, multi-well single-pipe cross-linking, concentrated supercharged, centralized dewatering treatment and external transmission" coal seam gas transport process.
正在翻译中..