The center line, level and contour line of the excavation section must be measured before drilling, and the position of the blast hole must be determined according to the blasting diagram. During drilling, the angle and direction of the surrounding holes shall be strictly controlled, and the error shall not be greater than 5cm, and the foot hole shall not exceed 8cm of the contour line of the excavation end face.<br>
正在翻译中..