For equipment, facilities, machinery and mold to develop and implement a care and maintenance measures (maintenance, inspection and maintenance). <br>For maintenance measures (planned and unplanned) should be recorded has been implemented and to analyze its potential for improvement. <br>Effective implementation of a process of down time, engine load, and to carry out analysis and optimization of die life. <br>The key bottleneck for process and equipment shall be identified, develop and maintain appropriate maintenance measures (preventive or predictive) maintenance on the basis of risk. <br>Spare parts for production equipment shall ensure that in place. <br>Implement the necessary resources to maintain the required maintenance must be in place. <br>To implement a mold die management system, particularly relates to some of the following issues: <br>use state flag (e.g.: qualified and unqualified) <br>mold history, including successive mold changes (e.g.: tracking card die) <br>Die life <br>mold ownership (e.g. : customer property)
正在翻译中..