Gas flow range: 2100 (200-221m3/h), 2800 (266-294m3/h).<br>The parameters of the boiler have been set at the factory.<br>Commissioning steps:<br>1, open the gas pipeline valve gas supply, activate the low pressure switch, close the gas pipeline valve.<br>2, the program automatically runs, the screen will prompt the ignition failed and no other alarm, indicating that the program is running correctly. If there are other fault codes on the screen, the fault must be handled first according to the fault code table. If only the ignition failure is reported, the gas can be turned on and the ignition is running normally.<br>3, after ignition operation, adjust the power. Find the interface as shown. The speed is adjusted between 900-6000. See if the gas consumption is within the specified flow rate. If the flow is not enough, the air valve needs to be adjusted.
正在翻译中..