In accordance with API 686 requirements, the ground-foot bolts generally have civil units in the pouring foundation when using positioning template spree, Kai'an is responsible for the foundation and foot bolt retesting work.<br>This project has some equipment needs to be pre-buried on-site foot bolts, in the pre-buried equipment installation floor plate with temporary pad iron placed on the equipment base, in the confirmation of the axis and installation of the elevation will be the foot screws from the equipment bolt hole, installation of double nuts, exposing part of the foot bolt scinatted out of 2 to 3 teeth, any part of the foot bolt at least 15mm from the reserved hole wall.<br>The bottom plate is flat.<br>All floor slabs must be scaled in accordance with the data in the construction drawing.<br>The bottom plate level is checked with a strip or frame level with an accuracy of 0.02mm.<br>For the api standard sour plate slab slower requires the level of the base plate to reach the vertical and horizontal both within the precise range of 0.2mm/m, the pump floor manufactured according to other standards is 0.4mm.<br>Height, axis, horizontal deviation of the base plate:<br>Allow deviation<br>Plane position<br>Level<br>Transverse<br>Longitudinal<br>When no mechanical connection to other equipment<br>5 mm<br>(API standard)<br>When there is a mechanical connection with other equipment<br>Base plate grout<br>In this project, there are two kinds of grout material.<br>One is epoxy grout and the other is a common slurry.<br>epoxy grout<br>Template preparation<br>All templates should be made of material spree with sufficient strength.<br>The inner surface of all templates is coated with three layers of wax to prevent the grouting from being adhered to.<br>The template has 25 mm (1 inch) on all vertical corners and grout horizontal surfaces, 45 degrees chamfering slats.<br>The template should be properly sealed to prevent the leak of the grout material.<br>Telescopic seam preparation
正在翻译中..