Damage to workers or other personnel in the ditch when the pipeline is under the trench. Starting heavy duty stands on the pipeline to direct. It is forbidden to stand on the pipeline and direct. Roller accident. The crane single-machine operation when working under the trench. The trench operation must be at least two pipe-hangers at the same time, strictly prohibited single-machine operation. The pendant falls. The safety factor of crane and rope card is poor. Check rope, card and other lifting equipment safety performance, lifting to be a special person alert, monitoring, workpieces prohibited station personnel and other operations. Touch the power transmission line. Lifting equipment is too close to the transmission line. Avoid transmission lines during construction. Roll over, hanger fall, hurt others. The operator violated operating procedures and technical specifications. Lifting work to carry out operating procedures and technical specifications