1, have been completed Kyaukpyu first stop, G100 + 500, G100 + 800 , G100 + 850, G100 + 900, G101 + 200, G75 + 950, G114 + 150, G114 + 000, G116 + 000, G118 + 000, G123 + 000, G147 + 000, G147 + 230, G148 + 850 troubleshooting, water conservation works; <br>2, G110: # 2-yl concreting retaining wall member and the groove wall; slope reinforcement temporary enclosure; field slope clean up; and a number of issues raised for rectification site supervision; supervision visits to check the + next to station; <br>3, G132 + 200: no construction schedule; <br>4, G132 + 300: on-site corrective maintenance works have been completed, the main processing skid ground subsidence beneath the pile, rows of inverted trough cracking problem, and strengthen vegetation planting, supervising routine inspection checks. <br>5, the problems found at the scene, confirmed that the construction unit rectification. "