On June 28, 2019, the workshop supervisor, Ying Haichao, found that Letrozole (process B) process specification H3-MPD-10108 02 edition found that the content of the process specification on page 3, item 1.8 (production packaging: loading finished products Inside the two-layer film bag, it is electrically sealed, put in a 10Kg aluminum can, capped and sealed, and labeled. Sales packaging: put the finished product in a two-layer film bag, electrically sealed, placed in 1Kg, 5Kg or 10Kg aluminum can Cover and seal, label, and finally put into a carton, and then label.) Aluminum can specifications (1kg, 5kg, 10kg) and letrozole (process B) product material information H3-MPD-10108-A12 05 version The specifications of the aluminum cans (1kg, 2kg, 5kg) are not consistent. <br><br>The root cause of the inconsistency between the aluminum can specification information and the product material information in the letrozole (process B) process specification is that the workshop personnel in the process of drafting the product material information (including packaging materials) as an annex to the process specification, in the process A part of the aluminum can specification information is still left in the text of the specification, and the subsequent workshop personnel did not check the process specification file again when checking the process documents related to the product aluminum can specification change, and mistakenly believed that the material no longer covered in the process specification. The reviewers did not review the results, which caused the aluminum can specifications in the process specification not to be updated to the latest status. <br><br>This deviation is caused by the product process regulations not being revised in time when the aluminum can specifications for product production / sales have changed. The product material information, packaging operation regulations and batch production records involved in the changes have been revised in time. There are no abnormalities in the records of aluminum cans, which have no effect on product quality. The information about the registration and reporting of the products involved in the verification has been updated as required without any abnormalities. <br><br>1. Revised H3-MPD-10108 "Letrozole (Process B) Process Regulations" 02 edition, delete the aluminum can specifications related information in the body of the process regulations, the specific aluminum can specifications can be found in the process regulations annex-product material information. <br>2. Revised H3-MPD-10329 "Letrozole Process Specification (Process B South Line)" version 00, delete the aluminum can specification related information in the body of the process specification, the specific aluminum can specification can be seen in the process specification annex-product material information.<br>3. Train workshop related personnel and auditors with H3-SOP-01007 "Process Specification Development and Management Procedures" version 05 training, emphasizing that the material information in the process specification body should be transferred to the attachment of the process specification. <br>4. Train the relevant personnel on H0-SOP-01001 "document preparation and management procedures" version 07, emphasizing the principle of systematic, dynamic, rigorous and traceability of document preparation.
正在翻译中..