在工人进场之前,最好将家里亲自测量一遍,拿笔尺记下来,标清楚。明确装修过程涉及的面积。特别是贴砖面积、墙面漆面积、壁纸面积、地板面积;明确主的英语翻译

在工人进场之前,最好将家里亲自测量一遍,拿笔尺记下来,标清楚。明确装修

在工人进场之前,最好将家里亲自测量一遍,拿笔尺记下来,标清楚。明确装修过程涉及的面积。特别是贴砖面积、墙面漆面积、壁纸面积、地板面积;明确主要墙面尺寸。特别是以后需要设计摆放家具的墙面尺寸。地面保护膜 3、主体拆改,让空间更实用 主体拆改是最先上的一个项目,主要包括拆墙、砌墙、铲墙皮、拆暖气、换塑钢窗等。拆改完的垃圾,要及时清理出去,保证室内的清洁,也是为了方便施工。此时,该把成品门定下来了。这时最好把橱柜、抽油烟机、灶具、热水器逛透,并尽量确定下来。 4、水电改造,安排好每个空间的用途 水电改造是最重要的环节,一定要确定好开关、灯具、台盆、浴缸、洗衣机等等确切的位置。水电改造前,橱柜设计师应上门进行第一次测量,帮你确定好电源、水路的改造方案。热水器,也最好派人来根据你所确定的型号,设计好电源、上下水接口的位置。提醒:水盆下面的墙上,最好留电源插座,方便装厨宝。空调洞和电源尽量放在床头的这面墙上,避免以后空调直接对着人吹。强电和弱点要保持20公分的间距,例如,插座和网线间要留20公分距离。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Before the workers enter the field, it is best to measure it at home, take a pen ruler and mark it clearly. Clarify the area involved in the renovation process. Especially the tile area, wall paint area, wallpaper area, floor area; clearly define the main wall size. In particular, it is necessary to design the wall size of the furniture in the future. Ground protective film <br>3. The main <br>body is dismantled and reformed to make the space more practical. The main body and dismantled and reformed is the first project, mainly including demolition of walls, masonry, shoveling, heating, and plastic steel windows. The dismantled garbage should be cleaned out in time to ensure the cleanliness of the room, also for the convenience of construction. At this point, it is time to finalize the finished door. At this time, it is best to walk through the cabinets, cooker hoods, stoves, and water heaters, and try to be sure. <br>4. Hydropower transformation, arrange the use of each space <br>Hydropower transformation is the most important link, we must determine the exact location of switches, lamps, washbasins, bathtubs, washing machines, etc. Before the renovation of water and electricity, the cabinet designer should come to the door for the first measurement to help you determine the transformation plan of the power supply and waterway. The water heater is also best to send someone to design the location of the power supply and the water connection according to the model you have determined. Reminder: It is best to leave a power socket on the wall below the sink to facilitate the installation of kitchen treasures. The air conditioning hole and power supply should be placed on this wall at the head of the bed as much as possible to avoid the air conditioner blowing directly at people in the future. Strong electricity and weak points should be kept at a distance of 20 cm. For example, a distance of 20 cm should be left between the socket and the network cable.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Before the workers enter the field, it is best to personally measure the home, take the pen ruler down, mark clearly. Clarify the area involved in the renovation process. In particular, brick area, wall paint area, wallpaper area, floor area; Especially in the future need to design the size of the wall furniture. Ground protection film<br> 3, the main body demolition, so that the space more practical<br> The main demolition is the first project, including the demolition of walls, wall building, shoveling wall skin, demolition of heating, plastic steel windows and so on. The waste that has been removed should be cleared out in time to ensure the cleanliness of the room, but also to facilitate construction. At this point, it is time to set the finished door down. At this time, it is best to put the cabinet, smoke machine, stove, water heater through, and try to determine down.<br> 4, hydropower transformation, arrange the use of each space<br> Hydropower transformation is the most important link, be sure to determine the switch, lamps, basins, bathtubs, washing machines and other exact location. Before the hydropower transformation, cabinet designers should go to the door to carry out the first measurement, help you determine a good power supply, waterway transformation program. Water heater, also best to send someone according to the model you determined, design a good power supply, up and down the water interface location. Reminder: The wall below the basin, it is best to leave a power outlet, convenient to install kitchen treasure. Air conditioning holes and power supply as far as possible on this wall at the end of the bed, to avoid the air conditioning directly to the people after blowing. Strong power and weakness to maintain a 20 cm gap, for example, between the socket and the network cable to leave a 20 cm distance.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Before workers enter the site, it's better to measure them in person at home, take a pen and ruler, and mark them clearly. Define the area involved in the decoration process. In particular, the tiling area, wall paint area, wallpaper area, floor area; clear the main wall size. Especially in the future, we need to design the wall size of furniture. Ground protective film<br>3. The main body is dismantled to make the space more practical<br>The demolition and reconstruction of the main body is the first project, mainly including the demolition of walls, building walls, shoveling wall skins, demolition of heating, replacement of plastic steel windows, etc. The removed and modified garbage shall be cleaned out in time to ensure the indoor cleanness, which is also for the convenience of construction. At this time, it's time to fix the finished door. At this time, it's best to stroll through the cupboard, range hood, stove and water heater, and try to make sure.<br>4. Water and electricity transformation, arrange the use of each space<br>Water and electricity transformation is the most important link, we must determine the exact location of switches, lamps, basins, bathtubs, washing machines and so on. Before the transformation of water and electricity, the cabinet designer should carry out the first measurement at the door to help you determine the transformation plan of power supply and water circuit. For water heater, it is better to send someone to design the position of power supply, water inlet and water outlet according to the model determined by you. Reminder: on the wall under the water basin, it's better to leave a power socket for the convenience of installing kitchen treasures. The air conditioning hole and power supply should be placed on the wall at the head of the bed as far as possible, so as to avoid the air conditioning blowing directly at people in the future. Keep a distance of 20cm between strong electricity and weak points. For example, keep a distance of 20cm between socket and network cable.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: