The first station, G75-950, G100-500, G100-800, G100-850, G100-900, G101-200, G114-150 (into the station road), G116, G123 has been completed, and the total completion of the total progress is 100%; <br>G114, G118, G147-000, G147-230, G148-850: completed, the total completion of the total progress of 100%.<br>"1, G132,300: anti-slip pile to complete construction, drainage ditch to complete construction, the remaining new pile inter-stop bezel has not been done, no construction progress this week, the cumulative completion of the total progress of 98%; 2, G132 and 200: the old pile site pile inter-stopbeving completed construction; pile pre-PE membrane laying completed; drainage channel completed 30%, this week on-site drainage groove crack repair; temporary reverse soil and water removal and other maintenance and repair work, no construction progress, the cumulative completion of 70%. <br>" <br>G110: Reinforcement slope when facing the fence; new 3 s concrete retaining wall pouring completed 40m; 2 s concrete retaining wall completed 12m, the total progress of the project 68%<br>"1, G424: completed, the cumulative completion of the total progress of 100%; 2, G529 plus 40: completed, the cumulative completion of the total progress of 100%. <br>" Yijiang bank protection: completed, the cumulative completion of the total progress of 100%.
正在翻译中..