皎漂首站、G75+950、G100+500、G100+800、G100+850、G100+900、G101+200、G114+150(进站道的英语翻译

皎漂首站、G75+950、G100+500、G100+800、G100

皎漂首站、G75+950、G100+500、G100+800、G100+850、G100+900、G101+200、G114+150(进站道路)、G116、G123已完工,累计完成总进度100%; G114、G118、G147+000、G147+230、G148+850:已完工,累计完成总进度100%。 "1、G132+300:抗滑桩完成施工;排水沟完成施工;剩余新桩桩间挡板未做,本周无施工进度,累计完成总进度98%;2、G132+200:老桩部位桩间挡板完成施工;桩前PE膜铺设完成;排导槽完成30%,本周现场进行排导槽裂隙修复;临时倒水土埂加设;部分地面植被绿化等维护修复工作,无施工进度,累计完成总进度70%。" G110:加固坡面临时围挡;新增3#混凝土挡墙浇筑完成40m;2#混凝土挡墙完成12m,工程进度累计总进度68% "1、G424:已完工,累计完成总进度100%;2、G529+40:已完工,累计完成总进度100%。" 伊江护岸:已完工,累计完成总进度100%。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Kyaukpyu first stop, G75 + 950, G100 + 500 , G100 + 800, G100 + 850, G100 + 900, G101 + 200, G114 + 150 ( inbound path), G116, G123 has been completed, a total of 100% of the total progress ; <br>G114, G118, G147 + 000, 230 + G147, G148 + 850: has been completed, a total of 100% of the overall schedule. <br>"1, G132 + 300: sliding pile construction is completed; complete drainage construction; remaining between baffle without making a new pile, no construction schedule week, total accumulated progress% 98; <br>2, G132 + 200 is: old pile portion between piles baffle completion of construction; pile PE film before completion of the laying; drainage canal completed 30% this week, the scene drainage canal fracture repair; temporary pour plus water and soil ridge located; part of the ground vegetation greening maintenance repair work, no construction schedule , the accumulated total progress% 70. " <br>G110: reinforced slope temporary enclosure; # 3 new concrete retaining wall placement completed 40m; 2 # concrete retaining wall completed 12m, total cumulative progress of the project progress% 68 <br>" 1, G424: have completed, the total accumulated progress of 100%; <br>2, G529 + 40: has been completed, a total of 100% of the overall schedule. " <br>Ayeyawady River revetment: have been completed, a total of 100% of the total schedule.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The first station, G75-950, G100-500, G100-800, G100-850, G100-900, G101-200, G114-150 (into the station road), G116, G123 has been completed, and the total completion of the total progress is 100%; <br>G114, G118, G147-000, G147-230, G148-850: completed, the total completion of the total progress of 100%.<br>"1, G132,300: anti-slip pile to complete construction, drainage ditch to complete construction, the remaining new pile inter-stop bezel has not been done, no construction progress this week, the cumulative completion of the total progress of 98%; 2, G132 and 200: the old pile site pile inter-stopbeving completed construction; pile pre-PE membrane laying completed; drainage channel completed 30%, this week on-site drainage groove crack repair; temporary reverse soil and water removal and other maintenance and repair work, no construction progress, the cumulative completion of 70%. <br>" <br>G110: Reinforcement slope when facing the fence; new 3 s concrete retaining wall pouring completed 40m; 2 s concrete retaining wall completed 12m, the total progress of the project 68%<br>"1, G424: completed, the cumulative completion of the total progress of 100%; 2, G529 plus 40: completed, the cumulative completion of the total progress of 100%. <br>" Yijiang bank protection: completed, the cumulative completion of the total progress of 100%.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Kyaukpyu initial station, G75 + 950, G100 + 500, G100 + 800, G100 + 850, G100 + 900, G101 + 200, g114 + 150 (access road), G116, g123 have been completed, and the total progress has been 100%.<br>G114, G118, G147 + 000, G147 + 230, G148 + 850: completed, with a total progress of 100%.<br>"1. G132 + 300: the anti slide pile construction is completed; the drainage ditch construction is completed; the baffle between the remaining new piles is not completed, and there is no construction progress this week, with the total progress of 98%.<br>2. G132 + 200: the construction of the baffle between the old piles has been completed; the laying of PE film in front of the piles has been completed; 30% of the drainage channel has been completed, and the cracks of the drainage channel have been repaired on site this week; the temporary backwater ridge has been added; some of the maintenance and repair works such as vegetation greening have no construction progress, and the total progress has been completed by 70%. "<br>G110: the reinforced slope faces the time fence; the new 3 × concrete retaining wall is 40m; the 2 × concrete retaining wall is 12M, and the total project progress is 68%<br>"1. G424: completed, 100% of the total progress;<br>2. G529 + 40: completed, and the total progress is 100%. "<br>Yijiang revetment: it has been completed and the total progress is 100%.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: