On the evening of May 21, 2021, 110KV Hisun Electric Department Yu Wei discovered that all the substations were losing power at 22:29:39, and the whole plant resumed power transmission at 22:29:59. The power loss time was 20 seconds. <br><br><br>The most likely cause of this deviation is that during the automatic load reversal of the 1# main transformer switch and the 2# main transformer switch, although the 10 KV circuit breakers of the #1 and #2 main transformers were put into use at the same time, it may be due to electrical appliances. Individual differences in component performance, 1# main transformer circuit breaker due to long service life, performance degradation, unqualified operating indicators, when the 2# main transformer switch is disconnected, 1# main transformer circuit breaker trips because it cannot carry all the load. Electricity causes this deviation to occur.