2021年5月21日晚上110KV海正电气部门於薇发现变电所在22:29:39全所失电,在22:29:59全厂恢复送电,失电时间是20秒。 的英语翻译

2021年5月21日晚上110KV海正电气部门於薇发现变电所在22:2

2021年5月21日晚上110KV海正电气部门於薇发现变电所在22:29:39全所失电,在22:29:59全厂恢复送电,失电时间是20秒。 导致本次偏差的最有可能原因是1#主变开关与2#主变开关负荷自倒过程中,虽然#1、#2主变10 KV断路器在同时期投入使用,但是可能是因为电器元件性能的个别差异,1#主变断路器因为使用年限长,性能下降,运行指标不合格,当2#主变开关断开时,1#主变断路器因为承载不了所有负荷而自行跳闸失电,导致该次偏差发生。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
On the evening of May 21, 2021, 110KV Hisun Electric Department Yu Wei discovered that all the substations were losing power at 22:29:39, and the whole plant resumed power transmission at 22:29:59. The power loss time was 20 seconds. <br><br><br>The most likely cause of this deviation is that during the automatic load reversal of the 1# main transformer switch and the 2# main transformer switch, although the 10 KV circuit breakers of the #1 and #2 main transformers were put into use at the same time, it may be due to electrical appliances. Individual differences in component performance, 1# main transformer circuit breaker due to long service life, performance degradation, unqualified operating indicators, when the 2# main transformer switch is disconnected, 1# main transformer circuit breaker trips because it cannot carry all the load. Electricity causes this deviation to occur.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
On the evening of May 21, 2021, the 110kV Haizheng electrical department found that the substation was lost at 22:29:39, and the power was restored at 22:29:59, and the power loss time was 20 seconds.<br>The most likely reason for this deviation is that during the process of load switching between 1 main transformer and 2 main transformer, although 10kV circuit breaker of main transformer 1 and 2 main transformer is put into use in the same period, it may be due to the individual difference of electrical component performance. 1. The main transformer breaker is not qualified due to its long service life, poor performance and unqualified operation index. When 2 main transformer switch is off, 1. The main transformer breaker tripped and lost power because it could not bear all the load, which led to this deviation.<br>
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
On the evening of May 21, 2021, Yu Wei, 110KV Haizheng Electric Department, found that the substation lost power at 22:29:39, and the whole plant resumed power transmission at 22:29:59. The power loss time was 20 seconds.The most likely cause of this deviation is that the 10 KV circuit breakers of the #1 and #2 main transformers were put into use at the same time during the load self-reversing process of the 1# and 2# main transformer switches, but it may be due to the individual differences in the performance of electrical components. Because of the long service life, the performance of the 1# main transformer circuit breaker declined and the operation index failed. When the 2# main transformer switch was turned off, the 1# main transformer circuit breaker tripped and lost power because it could not bear all the loads.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.