Brief story, Dr. Michael sent Meko report to RD/C, CC me, RD/C on the 193rd floor of BBAC, according to the normal process, they should lead the investigation and give a reply message, I am supportive, but they are lonely and silent. I analyzed the meko report and thought that some problems were manufacturing problems, some design problems, factory manufacturing problems I could reply to, but design problems were not my responsibility, so I replied to the picture of the status of the body PT3 glue. During this time, I organized several communication sessions with RD/C, and I suggested that they should go to the DT room to confirm on site and arrange a 1-volume PT3 test drive, but they gave up the opportunity. In the follow-up communication meeting, I once again insist on joint to the site confirmation, RD/C only agreed to the site confirmation.<BR>Today, I jointly identified five issues with RDC, three manufacturing aspects, no non-conformities, two design issues, all corrosion risks, RDC prepared to meet with RDKSO to study and assess the risk.<BR>Subsequently, I will send you the on-site question against MEKO as a SMC report
正在翻译中..