1. Revision 6.6.2 overlapping finished height of the content <br>2. 6.8.1.1 revised memo content and quality consistency contract <br>the shelf life of the electrolytic solution 3 and the revised expiration date
1. Revision 6.6.2 Finished product overlap height content<br>2. Revising 6.8.1.1's notes are consistent with the quality contract 3. Revising the storage period and validity period of the electrolyte
1. Revise 6.6.2 finished product overlap height content<br>2. The remarks in 6.8.1.1 are consistent with the quality contract.<br>3. Revise the storage period and validity period of electrolyte<br>