CP-TZ-API- D-TZ-API-IP-21011-21001: D-TZ-API-IP-21011-Attachment 1-P DJ13 server emergency recovery plan. <br>CP-TZ-API- D-TZ-API-IP-21011-21002: D-TZ-API-IP-21011-Attachment 1-R DJ13 server emergency recovery report. CP-TZ-API-D-TZ-API-IP-21011-21003: 2084011N210602-021~ 2084011N210602-026 Six batches of crude meropenem were re-tested. <br>CP-TZ-API-D-TZ-API-IP-21011-21004: The intermediate precision of the linezolid cleaning method was verified again. CP-TZ-API- D-TZ-API-IP-21011-21005: Taking this deviation as a case, perform CL-SOP-FE002 "Information Technology Center System Management Procedure" and H0-SOP-90004 "Non- The retraining of the “Change Request Management Program for Industrial Control Computerized System” emphasizes that the server must be added or modified in the configuration change process, and it should be carried out within a time that does not affect normal business (such as after work or on non-working days). All execution processes require a second person to review. Follow-up on the left "Root Cause of Deviation".