1, the content modification 6.3,6.4,6.6.2 <br>2, modify the contents and processes of 6.1.1 / 6.1.2 / 6.1.4 using barcode system <br>3, and the new stack of material handling 6.6.1.6/6.6.1.7 put the height of <br>4, modify 6.8.1.5/6.8.1.11 filled out by hand BIN card recording
正在翻译中..