Growing up deep-buried water tunnel construction drainage consists of normal drainage and sudden surge of water. This paper introduces the selection and technical application of the equipment of the 1 standard drainage system for the construction of Dali I section of the water-draining project in Yunnan Province, so as to ensure the reliable drainage of the construction of the deep-buried drainage tunnel.
正在翻译中..