(3) Installation of the large cover and the outlet sub-section; install the gasket on the joint surface of the large cover, and fasten it with an inclined iron. <br>If there is open welding or cracks in the inclined iron groove, electric welding should be used to repair the welding, and the inclined iron shall be reinstalled. <br>⑷Adjustment of the pulse solenoid valve; the solenoid valve action interval is normal, every 30 seconds, the pressure is adjusted to 0.4MPa. The <br>differential pressure device is reinstalled. <br>⑸Close the manhole door; replace the sealing ring of the manhole door again. If the top rod is open or deformed, weld it with electric welding and repair it. It is firm and firm without leakage <br>. Reinstallation; the purge and vibration air source tank is fixed and reliable, and there is no leakage at the inlet and outlet joints.
正在翻译中..