②After the test is over, the sample is immediately connected to the baby-lin-Ⅱ, the laptop is powered on DC14V, and the sleep & wake-up function test is performed, which is required to be completed within 5 minutes.
(2) After the test, the sample is immediately connected to baby-lin-II., after the laptop power DC14V, for sleep and wake-up function test, required to be completed in 5 minutes.
② After the test, the sample is connected to the baby Lin - Ⅱ and notebook computer immediately, and then power on dc14v for sleep & wake-up function test, which is required to be completed within 5 minutes.<br>