G110:清理坡面上方滑落的淤土,恢复坡面临时围挡;原3#混凝土挡墙基础浇筑完成11m,基础以上1m高的位置混凝土浇筑完成11m;因连续降雨的英语翻译

G110:清理坡面上方滑落的淤土,恢复坡面临时围挡;原3#混凝土挡墙基

G110:清理坡面上方滑落的淤土,恢复坡面临时围挡;原3#混凝土挡墙基础浇筑完成11m,基础以上1m高的位置混凝土浇筑完成11m;因连续降雨冲毁影响,加上冲毁前的进度,工程进度累计总进度58% 1、G424:已完工,累计完成总进度100%;2、G529+40:已完工,累计完成总进度100%。" 伊洛瓦底江:干砌石护坡放置石块完成;护坡格构骨架制作完成,上部已开挖完成31个,下部已开挖并浇筑完成25个(已淹没);挡墙累计已完成浆砌石250方;9#护岸正在打桩完成,放砂袋完成约1500个;10#护岸正在打桩,约完成70%,剩余部分存在征地问题,放砂袋约1000个,累计完成总进度99%。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
G110: clean up silt soil slope above the slide, slope restoration temporary enclosure; # 3 original concrete retaining wall placement completed 11m, 1m high position above the foundation concrete pouring is completed 11m; destroyed due to continuous rainfall influence, plus red progress destroyed before the progress of the project schedule cumulative total% 58 <br>. 1, G424: has been completed, the progress accumulated total 100%; <br>2, G529 + 40: has been completed, a total of 100% of the overall schedule. " <br>Irrawaddy: dry stone pitching placed stones complete; slope lattice skeleton finished, the upper 31 has been completed excavation, excavation and the lower portion has completed pouring 25 (already submerged); accumulated wall 250 has been completed for Masonry square; 9 # revetment piling is completed, the completion of the discharge of sand bags to about 1500; 10 # piling revetment is, about 70% complete, there is a problem remaining portion land, sand bags placed about 1000, a total of 99% of the overall schedule.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
G110: Clean up the silt that slides above the slope, restore the slope when facing the containment;<br>1, G424: completed, the cumulative completion of the total progress of 100%; 2, G529 plus 40: completed, the cumulative completion of the total progress of 100%. <br>" Irrawaddy River: dry masonry slope placement stone completed, slope block skeleton production completed, the upper part has been excavated to complete 31, the lower part has been excavated and poured to complete 25 (inundated); About 70% completed, the remaining part of the land acquisition problems, sand bags about 1000, the cumulative completion of the total progress of 99%.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
G110: clean up the falling silt on the slope surface and restore the time fence on the slope surface; the original 3 × concrete retaining wall foundation has been poured 11m, and the concrete pouring at the position 1m high above the foundation has been completed 11m; due to the impact of continuous rainfall, plus the progress before the erosion, the total progress of the project is 58%<br>1. G424: completed, 100% of the total progress;<br>2. G529 + 40: completed, and the total progress is 100%. "<br>Irrawaddy River: dry stone pitching and stone placing are completed; the construction of slope protection grid framework is completed, 31 upper parts have been excavated, 25 lower parts have been excavated and poured (submerged); the retaining wall has completed 250 cubic meters of masonry; 9 × revetment is in the process of piling, about 1500 sandbags have been put; 10 × revetment is in the process of piling, about 70%, and the remaining part has land acquisition problems, about sandbags have been put. 1000, 99% of the total progress.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: