The construction cost under the two construction methods is disassembled and analyzed, as follows:<br><br>Comparison of the cost of the assembly design and the civil engineering of the watering design<br> <br>As can be seen from the above table, the use of assembly design, in underground engineering, masonry works, floor works, roofing and waterproofing works, and sporadic engineering and measures projects are more economical than the traditional watering design cost savings.<br><br>1.218 square meters of European-style light steel assembly building material cost list, i.e. a standard 218 square meters of light steel assembly building costs. (excluding labor costs, which vary widely from region to region, it is difficult to count labor costs, which the chairman did not specify) Construction costs include not only the cost of construction at the time of construction, but also the maintenance costs incurred during the construction life cycle, as well as other expenses such as the time cost of the homeowner's investment during the construction process.<br>We analyze the following aspects, based on the construction area of 200 square meters, material costs selected the 2018-2019 market average price of major building materials as the standard:
正在翻译中..