该引水隧洞总长4623m,为城门型无压隧洞,出口与水电站前池连接。引水隧洞进口闸门段长6m,坡降i=1/1100,净宽5.40m,设计引用流的英语翻译

该引水隧洞总长4623m,为城门型无压隧洞,出口与水电站前池连接。引水

该引水隧洞总长4623m,为城门型无压隧洞,出口与水电站前池连接。引水隧洞进口闸门段长6m,坡降i=1/1100,净宽5.40m,设计引用流量47.17m3/s,净高6.26m,顶拱中心角120°。本次施工组织设计主要内容包括施工总平面布置、施工进度计划和主体方案施工、施工安全文明环保和质量等保证措施。根据工程的特点、结构和施工难度要求编制出切实可行的施工方案。施工总平面布置中涉及到料场、拌和系统、机械修理厂的布置等,合理的空间布置能有效利用场地的最大化。施工进度计划主要有整个计划的安排和隧洞的具体施工步骤,同时要做出保证工期的措施,工程总工期2年。主体工程施工主要包含了涉及岩石开挖、钻孔爆破、锚喷支护等,根据隧洞的条件选择出最优的施工方案。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The diversion tunnel has a total length of 4623m and is a city-gate type pressureless tunnel. Its outlet is connected to the front pool of the hydropower station. The entrance gate section of the diversion tunnel is 6m long, the slope drop i = 1/1100, the net width is 5.40m, the design reference flow is 47.17m3 / s, the net height is 6.26m, and the top arch center angle is 120 °. The main contents of this construction organization design include the general layout of the construction, the construction schedule plan and the main plan construction, construction safety, civilization, environmental protection and quality and other guarantee measures. According to the project characteristics, structure and construction difficulty requirements, a practical construction plan is compiled. The general layout of the construction involves the layout of the material yard, mixing system, mechanical repair plant, etc. A reasonable spatial layout can effectively maximize the use of the site. The construction schedule mainly includes the arrangement of the entire plan and the specific construction steps of the tunnel. At the same time, measures to ensure the construction period must be made. The total construction period of the project is 2 years. The main project construction mainly involves rock excavation, borehole blasting, anchor-shotcrete support, etc. The optimal construction plan is selected according to the conditions of the tunnel.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The total length of the water tunnel 4623m, for the city gate type pressure-free tunnel, the exit and the hydropower station front pool connection. The inlet gate section of the drainage tunnel is 6m long, the slope drop i 1/1100, the net width is 5.40m, the design reference flow is 47.17m3/s, the net height is 6.26m, the center angle of the top arch is 120 degrees. The main contents of the construction organization design include the construction of the overall layout, construction schedule and main program construction, construction safety, civilization and quality assurance measures. According to the characteristics, structure and construction difficulty requirements of the project to prepare a practical construction plan. The construction of the general floor plan involves the material field, mixing system, mechanical repair shop layout, reasonable space layout can effectively use the maximum use of the site. The construction schedule mainly has the arrangement of the whole plan and the specific construction steps of the tunnel, and at the same time, the measures to ensure the duration of the project shall be made, and the total construction period shall be 2 years. The main project construction mainly includes the rock excavation, drilling blasting, anchor spray support and so on, according to the conditions of the tunnel to choose the optimal construction plan.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The total length of the headrace tunnel is 4623m, which is a non pressure tunnel of the gate type. The outlet is connected with the forebay of the hydropower station. The intake gate section of the Headrace Tunnel i s 6m long, I = 1 / 1100 slope, 5.40m clear width, 47.17m3/s design reference flow, 6.26m clear height and 120 ° crown center angle. The main contents of this construction organization design include general construction layout, construction schedule and main scheme construction, construction safety, civilization, environmental protection and quality assurance measures. According to the characteristics, structure and construction difficulty of the project, a feasible construction scheme is prepared. The general layout of construction involves the layout of stock yard, mixing system and mechanical repair shop, and reasonable space layout can effectively maximize the use of the site. The construction schedule mainly includes the arrangement of the whole plan and the specific construction steps of the tunnel. At the same time, measures shall be taken to ensure the construction period. The total construction period of the project is 2 years. The construction of the main works mainly includes rock excavation, borehole blasting, bolting and shotcreting support, etc. the optimal construction scheme is selected according to the conditions of the tunnel.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.