(2) reservoir conventional scheduling scheme can not meet the demand of water inside and outside the channel. By changing the scheduling rules reservoir fullness adjustment and scheduling rules Nierji reservoir, the channel, the outer channel substantially water needs can be met.
正在翻译中..