6.9.5 Precautions for handling raw materials:<br>6.9.5.1 Materials shall be qualified by the feed inspection and are labelled with a qualified label before they can be transported to the warehouse.<br>6.9.6 Precautions for handling process products and quasi-finished products<br>6.9.6.1 The production line shall plan the driving passage, and the handling of the product and the quasi-finished product shall be operated according to the specified driving channel, so as not to cause danger.<br>6.9.6.2 Semi-finished, quasi-finished products in the use and handling, the first to examine the items and records of the record is correct and the quality control inspection qualified person, before being moved to the next project for use.<br>6.9.7 Precautions for handling finished products<br>6.9.7.1 The finished product can only be carried into storage after passing the course control course inspection. 6.9.7.2 The finished product should be shipped after passing oQC shipment inspection.
正在翻译中..