Future action: expected failed rate reduce from 2.6% to 0.8%. <br>Before the AG feeds, add the CG incoming concavity and convexity inspection item to the inspection item under the green light 8/26
Future action: expected failed rate from 2.6% to 0.8%.<br> Before AG feed, add CG incoming bumps and bumps to the inspection project under the green light 8/26.
Future action : expected failed rate reduce from 2.6% to 0.8%.<br>Before Ag feeding, add CG incoming bump defect inspection item 8 / 26 in the green light inspection items<br>