To study the flood control operation of Fengman reservoir and the blocking opportunity of Baishan reservoir, further optimize the original flood control joint operation scheme of Fengman reservoir and Baishan reservoir [5], adjust the joint operation principle of the two reservoirs, so that the flood control capacity of the two reservoirs can be reasonably utilized, and give full play to the flood control functions of the two reservoirs.<br>
正在翻译中..