In order to guide the correct construction of construction personnel, to ensure safe production and civilized construction, special preparation of this construction program. This construction plan is applicable to the in-place commissioning of the C2 standard section thermal control system of the second phase of the Vietnamese coastal 2 x 660MW coal-fired power plant project, including meter verification, in-place equipment commissioning, circuit commissioning, thermal power supply system, etc.