The pump or compressor and motor shall be removed from the base plate, which shall be placed on the platform, with sizing block used to adjust any one processing surface of the base plate (usually four to six processing surfaces on one base plate) to the levelness required by the project specification. Then, the processing surface of the bottom plate shall be checked to see if it meets the requirements. When all the processing surfaces on the bottom plate meet the requirements of the project specification, the bottom plate can be installed.