塔筒制造工艺流程1.筒节原材料入厂检验材料复验钢板预处理数控切割下料尺寸检验坡口加工卷圆组焊纵缝校圆检测。顶法兰成品法兰入厂检验及试件复验与的英语翻译

塔筒制造工艺流程1.筒节原材料入厂检验材料复验钢板预处理数控切割下料尺

塔筒制造工艺流程1.筒节原材料入厂检验材料复验钢板预处理数控切割下料尺寸检验坡口加工卷圆组焊纵缝校圆检测。顶法兰成品法兰入厂检验及试件复验与筒节组焊100%UT检测平面度检测二次加工法兰上表面(平面度超标者)。其余法兰成品法兰入厂检验及试件复验与筒节组焊平面度检测。塔架组装各筒节及法兰组对检验焊接检测检验、划出内件位置线检验、组焊内件防腐处理内件装配包装发运。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Tower tube manufacturing process <br>1. Tube section <br>raw material incoming inspection material re-inspection steel plate pretreatment CNC cutting blanking material size inspection groove processing roll circle assembly welding longitudinal seam calibration inspection. <br><br>Top flange <br>Finished flange entry inspection and test piece re-inspection and cylinder joint welding 100% UT inspection flatness inspection Secondary processing of the upper surface of the flange (the flatness exceeds the standard). Incoming inspection of finished flanges, re-inspection of test pieces and flatness inspection of cylinder joint welding for <br><br>the remaining flanges. Assembling the tower , each barrel section and flange assembly inspection, welding inspection inspection, drawing inspection of internal parts position line, assembly and welding internal parts anti-corrosion treatment, internal parts assembly, packaging and shipping.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Tower manufacturing process flow<br>1. Barrel joint<br>Incoming inspection of raw materials, material re inspection, steel plate pretreatment, CNC cutting, cutting, size inspection, groove processing, rolling, welding, longitudinal seam rounding inspection.<br>Top flange<br>Incoming inspection of finished flanges and retesting of test pieces, as well as 100% UT inspection of cylinder assembly welding for flatness. Secondary processing of the upper surface of the flange (those with flatness exceeding the standard).<br>Other flanges<br>Incoming inspection of finished flanges and retesting of specimens, as well as flatness inspection of cylinder assembly welding.<br>Tower assembly<br>Inspection and welding inspection of each cylinder section and flange assembly, marking out the position line of internal components for inspection, anti-corrosion treatment of internal components for assembly welding, assembly, packaging and shipping of internal components.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Tower manufacturing process flow<br> 1. Socket<br> Raw materials incoming inspection, material reinspection, steel plate pretreatment, numerical control cutting and blanking size inspection, groove processing, coil assembly welding, longitudinal seam calibration inspection.<br> <br> Top flange<br> Factory inspection of finished flange, re-inspection of test pieces and assembly welding of cylinder joint 100%UT detection flatness detection secondary processing of upper surface of flange (if flatness exceeds the standard).<br> <br> Remaining flanges<br> Factory inspection of finished flange, re-inspection of specimen and flatness detection of barrel joint assembly welding.<br> <br> Tower assembly<br> Each socket and flange assembly shall be inspected, welded, inspected, the internal parts shall be marked out for inspection, the internal parts shall be assembled and welded for anticorrosion treatment, and the internal parts shall be packaged and shipped.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.