(1) Establish a rainy season construction command team to ensure the implementation of emergency response work in rainy season. (2) Information-based scientific management: due to the uncertainty and suddenness of severe weather such as construction storm, it is difficult to predict the damage degree. It is necessary to strengthen the control and management of meteorological information, pay attention to weather forecast, take effective safety measures and strengthen prevention in time. (3) Comprehensive protection: the construction site covers a wide range, including the safety protection of all parts of the site and temporary facilities, and the safety of all personnel. Therefore, when formulating safety measures, we must be meticulous and thoughtful, and do nothing because of small things, so as to leave hidden dangers and bring losses. (4) Reasonable arrangement of operation time: In principle, all operations should be stopped in case of strong wind and stormy weather above Grade 6, the personnel should be evacuated to a safe place, and the power supply of all electrical equipment and machines should be cut off. For the operation that can't be stopped due to the process, relevant safety measures must be implemented, and special personnel should be arranged to supervise the related operation. Continuous construction is necessary to ensure the quality. When it is impossible to stop, measures such as setting up a fortified canopy must be taken, or stop the operation in advance when accurate meteorological information is obtained.
正在翻译中..