模板要正确密封,能防止灌浆料的泄漏。伸缩缝准备伸缩缝能有效减少裂缝的产生,当灌浆的面积每超过1.8m×1.8m,可以设置厚度大约为<20mm的英语翻译

模板要正确密封,能防止灌浆料的泄漏。伸缩缝准备伸缩缝能有效减少裂缝的产

模板要正确密封,能防止灌浆料的泄漏。伸缩缝准备伸缩缝能有效减少裂缝的产生,当灌浆的面积每超过1.8m×1.8m,可以设置厚度大约为<20mm的伸缩缝,材料选用弹性的泡沫塑料条,用硅胶将泡沫塑胶条固定在基础面上及模板内侧,与底板中心线垂直。灌浆成型后将暴露的部分除去,随后采用硅胶将伸缩缝表面密封。底板准备检查所有底板外角有至少50毫米(2英寸)半径,以防止基础灌浆由于应力集中在转角而产生裂缝;确保所有地脚螺栓孔有一个至少3毫米的环状净空,以允许底板现场被调换;检查所有泵和其他小的底板已经有竖直调整顶丝;检查底板在每个隔舱已经有一个10厘米(最小值)的灌浆孔,靠近截面的每个转角有一个12毫米的排气孔;确保每个隔室有足够的灌浆孔和排气孔;确保底板调整顶丝已经有碳钢调平垫;确保所有底板的焊缝是连续不断的且没有裂纹。清除底板的所有灌浆表面的油脂、污垢。底板调整顶丝要涂上足够的蜡或油脂;其他底板孔(如联轴器罩的孔)要被堵住,以防止灌浆料进入。确保所有设备都被隔离,与所有管线、管道等断开,设备处于无应力状态。使用耐酸环氧灌浆的底板被接触面经过喷砂处理后,如果喷砂和灌浆的间隔时间较长时,在底板底部使用与灌浆料相应的底涂。如果泵底板为嵌入式结构,可以不做喷砂处理。灌浆前会议至少在灌浆前一天,召开灌浆全体人员参加的灌浆前会议,以明白和同意要采取的程序,确保所有所需的材料,澄清每个人灌浆的责任。灌浆前准备灌浆前灌浆料宜在16°~32°环境温度下存放24小时以上,保证使用时材料具有最佳操作性能。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The template should be properly sealed to prevent the leakage of grout. <br>Expansion joint preparation <br>Expansion joint can effectively reduce the occurrence of cracks. When the area of ​​grouting exceeds 1.8m×1.8m, an expansion joint with a thickness of less than 20mm can be set. The material is elastic foam plastic strip and the foam plastic strip is fixed with silicone On the base surface and the inside of the template, perpendicular to the centerline of the bottom plate. <br>After grouting, the exposed part is removed, and then the surface of the expansion joint is sealed with silicone. <br>The bottom plate is prepared to <br>check that all the bottom corners of the bottom plate have a radius of at least 50 mm (2 inches) to prevent cracks in the foundation grouting due to stress concentration at the corner; ensure that all anchor bolt holes have a ring clearance of at least 3 mm to allow the bottom plate to be Replacement; <br>check that all pumps and other small bottom plates have vertical adjustment <br>jacks ; check that the bottom plate has a 10 cm (minimum) grouting hole in each compartment, and a 12 mm row near each corner of the section Air holes; ensure that each compartment has sufficient grouting holes and exhaust holes; ensure that the bottom plate adjustment top wire has carbon steel leveling pads; ensure that the welds of all bottom plates are continuous and free of cracks. <br>Remove all grease and dirt on the grout surface of the bottom plate. <br>The bottom plate adjustment top wire should be coated with enough wax or grease; other bottom plate holes (such as the holes of the coupling cover) should be blocked to prevent the entry of grout. <br>Ensure that all equipment is isolated and disconnected from all pipelines, pipes, etc., and the equipment is in a stress-free state. <br>After the contact surface of the bottom plate with acid-resistant epoxy grouting has been blasted, if the interval between blasting and grouting is longer, use a primer corresponding to the grout at the bottom of the bottom plate. <br>If the pump bottom plate has an embedded structure, sandblasting can be omitted. <br>Pre-grouting meeting <br>At least one day before grouting, convene a pre-grouting meeting attended by all grouting staff to understand and agree on the procedures to be taken to ensure all required materials and clarify everyone's grouting responsibilities. <br>Preparation before grouting<br>Before grouting, the grouting material should be stored at an ambient temperature of 16° to 32° for more than 24 hours to ensure that the material has the best performance during use.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The template should be properly sealed to prevent the leak of the grout material.<br>Telescopic seam preparation<br>Telescopic seam can effectively reduce the production of cracks, when the area of the grout is more than 1.8m x 1.8m, you can set the thickness of about 20mm telescopic seam, the material selects elastic foam strip, with silicone foam plastic strip fixed on the base surface and the inside of the template, perpendicular to the center line of the base plate.<br>The exposed part is removed after the grouting is molded, and the telescopic seam surface is sealed with silicone.<br>Base plate preparation<br>Check that all the outer corners of the base plate have a radius of at least 50 mm (2 inches) to prevent cracks in the base grouting due to stress concentration at the corners, and ensure that all foot bolt holes have a ring-shaped clearance of at least 3 mm to allow the base plate to be replaced on site;<br>Check that all pumps and other small soleplates already have vertical adjustment top wire;<br>Check that the soleplate already has a 10 cm (minimum) grout hole in each compartment, a 12 mm vent at each corner near the cross-section;<br>Remove grease and dirt from all grout surfaces of the substrate.<br>The base plate adjustment top wire should be coated with sufficient wax or grease, and other base plate holes (such as the holes in the coupling cover) should be blocked to prevent the grouting from entering.<br>Ensure that all equipment is isolated, disconnected from all pipelines, pipes, etc., and that the equipment is stress-free.<br>After the base plate using acid-resistant epoxy grouting is blasted on the contact surface, if the interval between sand blasting and grouting is long, the base coating corresponding to the grouting is used at the bottom of the base plate.<br>If the pump base plate is an embedded structure, sandblasting can not be done.<br>Pre-Grout Meeting<br>At least the day before the grouting, a pre-grout meeting involving all the grout staff is held to understand and agree to the procedures to be followed, to ensure all required materials and to clarify the responsibility of each person for the grout.<br>Pre-preparation before grouting<br>The grout material should be stored at an ambient temperature of 16 to 32 degrees for more than 24 hours, so as to ensure the best operating performance of the material when used.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The formwork shall be properly sealed to prevent leakage of grouting materials.<br>Expansion joint preparation<br>The expansion joint can effectively reduce the cracks. When the area of grouting exceeds 1.8m * 1.8m, the expansion joint with a thickness of less than 20mm can be set. The material is made of elastic foam plastic strip, and the foam plastic strip is fixed on the base surface and the inner side of the template with silica gel, perpendicular to the center line of the bottom plate.<br>After grouting, the exposed part shall be removed, and then the expansion joint surface shall be sealed with silica gel.<br>Base plate preparation<br>Check that the outer corners of all baseplates have a radius of at least 50 mm (2 inches) to prevent the foundation grouting from cracking due to the stress concentration at the corners; ensure that all anchor bolt holes have a ring clearance of at least 3 mm to allow the baseplates to be replaced on site;<br>Check that all pumps and other small baseplates have vertical adjustment jackscrews;<br>Check that the bottom plate has a 10 cm (minimum) grouting hole in each compartment, and a 12 mm vent hole at each corner near the section; ensure that each compartment has enough grouting holes and vent holes; ensure that the top wire of the bottom plate adjustment has a carbon steel leveling pad; ensure that all the welds on the bottom plate are continuous and free of cracks.<br>Remove grease and dirt from all grouting surfaces of the base plate.<br>Sufficient wax or grease shall be applied to the top wire of the bottom plate adjustment; other bottom plate holes (such as the holes of the coupling guard) shall be blocked to prevent the grouting material from entering.<br>Ensure that all equipment is isolated, disconnected from all pipelines, pipelines, etc., and the equipment is in a stress-free state.<br>After the contact surface of the base plate with acid resistant epoxy grouting is sandblasted, if the interval between sandblasting and grouting is long, the primer corresponding to the grouting material shall be used at the bottom of the base plate.<br>If the pump base plate is of embedded structure, sand blasting is not required.<br>Pre grouting meeting<br>A pre grouting meeting attended by all grouting personnel shall be held at least one day before grouting to understand and agree the procedures to be adopted, ensure all required materials and clarify the responsibilities of each person for grouting.<br>Preparation before grouting<br>Before grouting, the grouting material should be stored for more than 24 hours under the ambient temperature of 16 ° ~ 32 ° to ensure the best operation performance of the material during use.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.