Serial number<br>stage<br>Project content<br>Demonstrate the basis of transformation, investigate the scope, type and objective principle of transformation, and prepare feasibility demonstration of transformation<br>Compilation and transformation basis, principle and scope 1<br>presentation.<br>Preparation of project overview, general layout and<br>Prepare engineering conditions, general layout requirements, construction period plan and arrangement, etc.<br>Two<br>Schedule of construction period<br>Product selection, scheme design of primary and secondary diagram, wiring terminal diagram design, listing and setting parameter table,<br>Technical scheme design 3<br>Inspection items and content design, listing the address list, etc.<br>Construction scheme design<br>Prepare construction schedule, equipment and material list, construction standards, quality and safety assurance measures, etc.<br>Four<br>Switch cabinet transformation, equipment cabinet installation, equipment primary and secondary wiring, equipment communication wiring, installation<br>Equipment installation, wiring and wiring inspection. Site modification<br>System parameter setting, protection setting, input and output setting, communication parameter setting, etc.<br>Equipment parameter setting<br>Five<br>Implementation<br>Prepare testing equipment, instruments, testing tooling, carry out testing project implementation, record test report, etc.<br>On site inspection of equipment<br>Signal interface joint debugging, communication interface joint debugging, electrical interlocking verification, etc.<br>Equipment system joint commissioning<br>Make preparation before putting into operation, test the primary current and working voltage to simulate the operation and formally put it into operation.<br>Putting the device into operation<br>
正在翻译中..