For the vertical direction operation pit depth is large, if the operating pit depth exceeds the operating height of the single bucket, the step-by-step excavation method is used. Excavator excavation process, must ensure that excavators or other equipment docked on the ground flatness and firmness, to prevent excavators or other equipment to reverse into the operating pit; In order to prevent the collapse of the operating pit caused by the pile of soil, the excavated soil is prohibited to be stacked above the operating pit on both sides of the parallel pipeline center line, and can only be stacked in the direction of the vertical pipe center line at both ends before and after the operation pit, and the stacking distance is more than 5m from the trench wall. Swordsblaster, air compressor and other equipment distance from the ditch wall is not less than 3m.