对于竖直方向操作坑深度较大,如果操作坑深度超过单斗的作业高度,则采用阶梯式开挖方式。挖掘机进行开挖过程中,务必确保挖掘机或其他设备停靠地面的的英语翻译

对于竖直方向操作坑深度较大,如果操作坑深度超过单斗的作业高度,则采用阶

对于竖直方向操作坑深度较大,如果操作坑深度超过单斗的作业高度,则采用阶梯式开挖方式。挖掘机进行开挖过程中,务必确保挖掘机或其他设备停靠地面的平整度及牢固性,防止挖掘机或其他设备向操作坑内倾覆;机械开挖单斗的操作方向只允许在沿着管道中心线单侧进行操作,单斗距离管道外壁的距离满足在役管道安全距离。为防止堆土造成的操作坑塌方,挖取出来的土禁止堆放在平行管道中心线两侧的操作坑上方,只能堆放在操作坑前后两端垂直管道中心线方向,并且堆放距离沟壁要超过5m。喷砂车、空压机等设备距离沟壁不小于3m。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
For the vertical operation pit depth is large, if the operation pit depth exceeds the working height of the single bucket, the stepped excavation method is adopted. During the excavation process, the flatness and firmness of the excavator or other equipment on the ground must be ensured to prevent the excavator or other equipment from overturning into the operation pit; the operation direction of the mechanical excavation single bucket is only allowed along the center of the pipeline The line is operated on one side, and the distance between the single bucket and the outer wall of the pipeline meets the safe distance of the pipeline in service. In order to prevent the collapse of the operation pit caused by the pile of soil, the excavated soil must not be stacked above the operation pits on both sides of the parallel pipeline centerline. More than 5m. Equipment such as sand blasting vehicles and air compressors are not less than 3m away from the trench wall.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
For the vertical direction operation pit depth is large, if the operating pit depth exceeds the operating height of the single bucket, the step-by-step excavation method is used. Excavator excavation process, must ensure that excavators or other equipment docked on the ground flatness and firmness, to prevent excavators or other equipment to reverse into the operating pit; In order to prevent the collapse of the operating pit caused by the pile of soil, the excavated soil is prohibited to be stacked above the operating pit on both sides of the parallel pipeline center line, and can only be stacked in the direction of the vertical pipe center line at both ends before and after the operation pit, and the stacking distance is more than 5m from the trench wall. Swordsblaster, air compressor and other equipment distance from the ditch wall is not less than 3m.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
If the depth of the operation pit in the vertical direction is larger than the operation height of a single bucket, the ladder excavation method shall be adopted. During the excavation process of excavator, it is necessary to ensure the flatness and firmness of the ground where the excavator or other equipment stops, so as to prevent the excavator or other equipment from overturning into the operation pit; the operation direction of single bucket of mechanical excavation is only allowed to operate along one side of the pipeline centerline, and the distance between the single bucket and the outer wall of the pipeline meets the safety distance of the pipeline in service. In order to prevent the collapse of the operation pit caused by soil stacking, the excavated soil shall not be stacked above the operation pit on both sides of the parallel pipeline center line, and can only be stacked at the front and rear ends of the operation pit perpendicular to the pipeline center line direction, and the stacking distance shall be more than 5m from the trench wall. The distance from equipment such as sand blasting car and air compressor to trench wall shall not be less than 3m.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: