1, G132 and 200: the draining groove appears at the bottom of the crack, the construction unit for maintenance. 2, G132-300: to deal with the problem of ground subsidence under the anti-slip pile. 3, strengthen vegetation planting. <br>" G110: This week on-site preparation of construction materials; 2 , the retaining wall pouring quality is better, and vibration; steel pipe pile increase using welding, in line with the drawing requirements.
正在翻译中..