The suspension of the steel column adopts the artificial lifting assist in place, the component in place adopts the single-machine rotary hair lifting, in order to improve the lifting efficiency, in the stacking of the column, as far as possible to make the column tie point, tie center and the base center three points of the common arc.<br>The suspension used in the suspension of the steel column is an anti-pull 2.5-ton sling with a lifting suspension, when the steel column is flat on the ground, the sling is tied to the bottom surface of the steel column more than 2/3 position, and placed under the steel column connection plate or cow leg When the steel column is erect, the sling relies on the connection plate of the steel column or the effective contact and friction of the cow leg to ensure the stability of the steel column upright, when the sling is tied with the steel column with the buckle, wearing a hemp rope in the unloading buckle at the same time, as a rope.<br>In order to protect the steel column itself and the paint from being damaged when lifting, a soft material pad is used in the four corners of the H-type steel when the sling is strapped.<br>Lifting the crane will be tied to the post slowly lifted off the ground 20CM after the suspension, check the sling and crane stability, and then the steel column booed up to the safety surface 40-100mm, by the installer to assist the steel column, aligned with the column foot anchor, command crane drop, insert the column into the column foot anchor, then the anchor bolt tightened, and the steel column after preliminary correction, the sling slowly loosened.<br>The steel column lifting hook method is as follows: when the steel column adjusts the verticality and ensures the stability of the steel column, the crane first slightly lowers and releases, while checking whether the steel column is insecure, if the steel column is stable upright and stable, can the crane release, release after the construction personnel in the safe range to shake and release the buckle connected hemp rope, so that the suspension belt, loosen the suspension after the slide, slide down to the ground after removal.<br>Steel column installation correction<br>The steel column is corrected immediately after installation, the vertical correction of the steel column is corrected, the measurement is placed on the horizontal axis with a 5M long-line hammer, and the verticality is measured in a straight line with a angle ruler.<br>In practice, often lined columns are erected, and then corrected, deviation from the middle line generally not more than 5mm.<br>When lifting steel beams or when installing vertical components, the steel columns must also be reviewed for correction.<br>Steel beam lifting<br>When lifting the crane using two 2 tons sling lifting, tie point for the two slings open angle is not greater than 60 degrees is appropriate.<br>The tie point is cushioned with a soft material to prevent damage to the steel components.<br>Lifting the first steel beam hanging from the ground about 50cm when suspended, confirm the safety of the slowly rising hook, the steel beam to the installation position height above, and then use the rope to rotate the steel beam to make it aligned to the connection plate, so that the hook in place, the hook slowly, and the steel beam bolt hole, align editing bolt hole, and bolt into it.
正在翻译中..