The payment period I accept is 30% advance payment, I will arrange for personnel to photograph the production of the machine every week, 30% of the main part of the machine to complete the payment, the remaining 40% before loading. (ps: The machine does not need to be assembled in Iran, you will receive the whole machine, my engineer goes to Iran to train the use of machine software)
正在翻译中..