1. 制作建筑图纸,在工厂根据客户的要求和建筑面积的大小,生产出所需要的龙骨数量。并计算所需要的各类材料。2.打地基。地基的作用是使土质更加的英语翻译

1. 制作建筑图纸,在工厂根据客户的要求和建筑面积的大小,生产出所需要

1. 制作建筑图纸,在工厂根据客户的要求和建筑面积的大小,生产出所需要的龙骨数量。并计算所需要的各类材料。2.打地基。地基的作用是使土质更加坚硬,使建筑结构更具有稳定性。3地基部分完成之后,建筑商将在工厂生产的建筑材料运送至施工地点,并且按照图纸将龙骨拼装完毕组成墙体后,按照装配的先后过程将材料摆放在施工地点。4先树立一面墙对齐地面标线,再依次树立相邻墙体。陆续树立好一层所有墙体,使每一面墙体垂直地面。在墙体底部垫入SBS防水卷材,并用铆钉整体固定一边墙体。5,四周墙体固定好后,开始安装楼梯部分,并铺装OSB板材,这将方便第二层所需材料的搬运。6 按照图纸的要求铺设第二层的横梁部分,并核对图纸,确保所有的铆钉位置与图纸相符合。7 第二层的楼层部分建造完成之后,在第二层的楼面部分,树立另外一道墙体,使其垂直并固定好,并以此建造其他墙体。8以一幢二层房屋为例,此时需要建造屋顶部分,并且为瓦片的铺装预留空间。9整栋房屋假装OSB板材,并填充保温隔热材料。10铺装铁丝网,同时填充混凝土,安装外墙的装饰板材。11墙面施工完成之后,开始铺设水电线路。12室内装饰。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1. Make architectural drawings and produce the required number of keels at the factory according to the requirements of customers and the size of the building area. And calculate the various materials needed. <br>2. Lay the foundation. The function of the foundation is to make the soil harder and make the building structure more stable. <br>3 After the foundation part is completed, the builder will deliver the construction materials produced in the factory to the construction site, and after assembling the keel to form a wall according to the drawings, place the materials at the construction site according to the sequence of assembly. <br>4 First set up a wall to align with the ground marking, and then build adjacent walls in turn. Successively set up all the walls on the first floor so that each wall is vertical to the ground. SBS waterproof coiled material is placed at the bottom of the wall, and one side of the wall is fixed with rivets as a whole. <br>5. After the surrounding walls are fixed, start to install the stair part and pave the OSB board, which will facilitate the handling of the materials required for the second floor. <br>6 Lay the beam of the second layer in accordance with the requirements of the drawings, and check the drawings to ensure that all rivet positions are consistent with the drawings. <br>7 After the construction of the second floor's floor is completed, build another wall on the second floor's floor to make it vertical and fixed, and then build other walls. <br>8 Take a two-story house as an example. At this time, it is necessary to construct the roof part and reserve space for the paving of tiles. <br>9 The whole house pretends to be OSB board and is filled with thermal insulation material. <br>10 Pave wire mesh, fill concrete at the same time, install decorative plates for external walls. <br>11 After the wall construction is completed, the laying of hydropower lines begins. <br>12 interior decoration.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1. Production of building drawings, in the factory according to customer requirements and the size of the building area, to produce the required number of keel. and calculate the various types of materials required.<br>2. Hit the foundation. The role of the foundation is to make the soil harder and the structure more stable.<br>3 After the completion of the foundation part, the builder will be the plant production of building materials to the construction site, and according to the drawings of the keel assembly into the wall, in accordance with the assembly process of the material placed at the construction site.<br>4 First set up a wall to align the ground line, and then set up adjacent walls in turn. One after another set up a layer of all the walls, so that each wall vertical ground. Place SBS waterproof coils in the bottom of the wall and secure one side wall with rivets as a whole.<br>5, the surrounding wall fixed, began to install the stair part, and laid oSB plate, which will facilitate the second layer of material shandling.<br>6 Lay the beam part of the second layer as required by the drawings and check the drawings to ensure that all rivets are in line with the drawings.<br>7 After the construction of the floor part of the second floor is completed, another wall is erected in the floor part of the second floor so that it is vertical and secure, and other walls are constructed accordingly.<br>8 Take a two-story house, for example, where roof parts need to be built and space reserved for tiles.<br>9 whole house pretends to be OSB sheet and fills with insulation.<br>10 covered with barbed wire, filling the concrete at the same time, and installing decorative panels on the exterior walls.<br>11 after the completion of the construction of the wall, began to lay water and electricity lines.<br>12 interior decoration.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. Make architectural drawings, and produce the required number of keel in the factory according to the requirements of customers and the size of building area. And calculate all kinds of materials needed.<br>2. Foundation construction. The function of the foundation is to make the soil harder and the building structure more stable.<br>3 after the foundation is completed, the builder will transport the building materials produced in the factory to the construction site, and after the keel is assembled to form the wall according to the drawings, the materials will be placed at the construction site according to the assembly sequence.<br>4 first set up a wall to align with the ground marking, and then set up adjacent walls in turn. One layer of all walls shall be set up in succession to make each wall vertical to the ground. SBS waterproof roll is padded at the bottom of the wall, and one side of the wall is fixed with rivets as a whole.<br>5. After the surrounding walls are fixed, start to install the stairs and pave OSB plates, which will facilitate the handling of materials required for the second floor.<br>6 lay the beam part of the second layer according to the requirements of the drawings, and check the drawings to ensure that all rivet positions are consistent with the drawings.<br>7 after the second floor is completed, another wall shall be set up in the second floor to make it vertical and fixed, and other walls shall be built accordingly.<br>8 take a two-story house as an example. At this time, it is necessary to build the roof part and reserve space for tile paving.<br>9 the whole house is made of OSB board and filled with thermal insulation materials.<br>10. The wire mesh shall be paved, and the concrete shall be filled at the same time, and the decorative plates of the external wall shall be installed.<br>11. After the completion of wall construction, start to lay water and electricity lines.<br>12 interior decoration.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: