Affected by Typhoon Lichma, some electrical equipment in the Iwate plant tripped and lost power. 2019.08.10 00:38 flash speed, 00:43 power outage, 00:52 power transmission. <br><br>This deviation is mainly caused by super typhoon, is an irresistible factor, belongs to environmental reasons. <br><br>1. The deviation against the quality of the oncology division has no effect, but the plant needs to be maintained, see "Deviation Investigation - Annex 09: Anti-Oncology Division Lichma Typhoon Impact Assessment Form." 2. In addition to the treatment of sodium satibutin222017-190802 according to non-conforming products, the deviation has no effect on the quality of other products in the synthesis division, as detailed in the "Deviation Investigation - Annex 10: Aseptic Group Ofe Typhoon Impact Assessment Form" and "Deviation Investigation - Annex 11: Non-sterile Group Lichma Typhoon Impact Assessment Table" of the Synthesis Division. 3. The affected plant needs maintenance, in addition to mevastatin (3025-A190712), for koalaning (2121-190701) to track the quality of the finished product, the deviation on the quality of other products of the micro-business unit has no effect, see "deviation investigation - Annex 12: micro-organisms first division of the Lichma Typhoon impact assessment table." 4. The deviation has no effect on the product quality of the micro-second business unit, but the plant needs to be maintained, as detailed in the "Deviation Investigation - Annex 13: Micro-Organisms Second Division Of Lichma Typhoon Impact Assessment Form". 4. API warehouse and public water and gas systems were not affected by typhoons, as detailed in "Deviation Survey - Annex 14: API QC Lichma Typhoon Impact Assessment Form"<br><br>1. Maintenance of the North Middle Door Beam slabs of Y20 buildings on the first floor. 2. Maintenance of the y20 East Third Roof Manhole. 3. Repair of the south-east roof of Y33, a first-floor building. 4. Maintenance of the east, south and north walls of Y33 buildings on the fourth floor. 5. Repair of the iron of the exterior walls of Y36 buildings on the east, south and north of the third floor. 6. Repair the windows of the south-west corner of the Y36 building on the third floor. 7. Repair of the ceiling of the Y36 men's locker room. 8. Repair of Y36 FU5-1 exhaust units. 9. Repair of the iron on the south facade of Y37 buildings on the third floor. 10. Repair of The Y37 FU6-1 exhaust units. 11. Repairs were made to the south-east corner windows of Y37 buildings on the third floor. 12. Repair of glass doors in the Y38 water pump area. 13. Fire doors on the roofs of Y38 buildings were repaired. 14. Maintenance of the North Middle Gate Beams of Y39 on the first floor. 15. Repairs were made to the windows of operating rooms 1 and 9 of Y39. 16. Repairs were made to the Y39 South-East Corner Escape Gate. 17. Repair of the roof glass doors of the Y50 building. 18. Maintenance of the second floor walkways and walls of Y50 aseptic fission common production area. 19. Repair of the Y50 south facade. 20. The shutters of the room of the Y50 four-story table-table Jubi star air-conditioned unit were repaired. 21-27 CAPA in the penultimate row of this table (line 999)
正在翻译中..