If the short-term power failure does not cause the above phenomenon, should be promptly started and in accordance with the freeze-dryer-related use of SOP regulations for operation.<br>If the tunnel sterilization dryer is in the "on-line sterilization and in-place cleaning" program, restart the program when you call.<br>Tunnel-type sterilization dryer, such as the heating section of the high temperature of more than 300 degrees C, it is required to manually twist the "hand twisting selection switch" to make the position in the open, the tunnel-type sterilization dryer heating section for compressed air cooling.<br>Tunnel sterilization dryer if in production, and only the cooling section has Xilin bottles, then after the call will be cooled section of the Xilin bottle cleared for demotion use, if the front of the cooling section (heating section, preheating section) also has Xilin bottles, then after the call to tunnel sterilization drying The machine is heated to a set sterilization temperature and lasts at least 5 minutes before the network belt can be activated, the tunnel-type sterilization dryer power failure in the preheated section of the Xilin bottle cleared after re-cleaning sterilization, the heating section, cooling section of the Xilin bottle clearing for downgrading use.<br>Vertical ultrasonic cleaning machine, if in the production state, when waiting for calls, must be in the power failure at the needle and out of the bottle track of the Xilin bottle clearance re-cleaning.<br>If the filling plug machine is in production and there is a power failure, the bottle turntable and the xilin bottle before the filling must be cleared for degraded use (discarded with unsealed liquid).<br>The glue plug in the glue plug is cleaned up for disposal.<br>When waiting for the call, the bottle turntable, track, glue plug for alcohol wipe, and self-purification at least 30 minutes before starting equipment production.<br>If the cap mill is in production and there is a power failure, the aluminum-plastic cover in the pipe must be cleared away for degraded use.<br>When you call, wipe the bucket with alcohol and after at least 30 minutes of self-cleaning before starting production of the equipment.<br>Stop the water.<br>During the production process, such as sudden water stopping: in addition to the freeze-dryer, the equipment requiring water should immediately stop working, shut down the equipment, and immediately notify maintenance personnel.<br>If the water supply department stops drinking water, it should contact the water company immediately to restore the water supply as soon as possible.<br>Belongs to the company to stop water, maintenance personnel should quickly find the cause, actively repair, as soon as possible to restore water supply.<br>After the restoration of water supply, the operation of the pulsation vacuum sterilizer is carried out in accordance with the provisions 7.1.2.2.<br>Stop the steam.<br>During the production process, such as sudden gas stop: at the same time immediately notify the water production personnel.<br>Belongs to the company's water production posts or boiler room reasons to stop steam, maintenance personnel should quickly find the cause, actively repair, if natural gas problems or external network gas suspension, should contact the natural gas company and the external network stop steam company contact, as soon as possible to resume gas supply.<br>The treatment method of the relevant equipment after the steam is stopped.<br>Pulsation vacuum sterilizer, freeze-drier if sterilization, if the stop steam more than a certain period of time sterilization chamber temperature began to drop, then shut down the equipment, resume the supply of steam, the specific operation by reference to 7.1.2.2 provisions.
正在翻译中..