Technical standards for the reclamation of forest land.<br>(1) The original trees in the project area are all retained in principle and cannot be cut down and planted.<br>(2) Slag requires local burial treatment.<br>(3) Topsoil clean-up: clean up surface weeds, small shrubs, etc. in the project area.<br>(4) Planting trees: digging pits, row spacing of 2.2m, pit standard 0.4 x 0.4, 0.4m.<br>(5) Tree pit backfilling soil: backfilling soil must be soil, to achieve the role of water conservation, fertilizer.<br>(6) Seedling requirements: to the main trees, seedlings high 0.8-1.0m or more.<br>(7) Seedling fertilizer: artificial fertilization.<br>(8) Seedling survival rate: the survival rate of seedlings must reach more than 96%, in a one-year warranty period, the dead seedlings must be replanted by the construction party.<br>4. Technical standards for the new repair of irrigation and drainage canals and ditches.<br>(1) Template size must meet the requirements of the design, to ensure that the specifications of the channel, thickness of the standard.<br>(2) channels from the trench, installation of soil mold, loading the pouring mold must be pulled line construction, to ensure that the ditch straight-line beautiful.<br>(3) now poured concrete channels, ditches, canal walls and floor thickness are 0.1m, the standard of concrete C20;<br>(4) The construction process requires to achieve wire-shaped beauty, surface flat, no honeycomb concave surface;<br>(5) The selection of materials and matching ratio: do not use sand and gravel containing soil, stone powder, matching ratio must meet the requirements of the design ratio.<br>(6) In the process of pouring the vibration rod to be hit in place, the template oil before the floating slurry clean, to ensure that the canal surface no honeycomb concave;<br>7 pay attention to control the release time, timely watering, to ensure that the channel does not burn;<br>(8) To ensure that there is a 5 meters long telescopic seam spacing;<br>(9) the shoulder to be flat, the inner wall to be smooth, no honeycomb hemp surface, mold joints to be flat, straight;<br>(10) 10 cm below the irrigation mouth to leave a water nest;<br>(1l) grasp the channel elevation, to ensure normal irrigation;<br>(l2) Pay attention to the bottom of the channel flat, do not store water.<br>5. Technical standards for road production in the field.<br>(1) New repair of production road: road width 2m, covers an area of 2.6m, the pavement laying 0.1m thick mud stone surface layer, the roadbed using 0.4m of the solid soil foundation, topsoil peeling thickness of 0.2m, of which 0.4m thick for the outer soil, the road surface is 0.3m above the field, no road shoulder.<br>(2) Renovation of the production road: the road surface paved solid, laying 0.1m thick mud stone surface layer compact.<br>(3) New field road: 3.0m wide road surface, covers an area of 3.8m wide, bilateral masonry, shoulder higher than the field 0.3-0.5m. Roadbed must be line, crush molding, to maintain a straight line of beautiful, the bilateral requirements for the masonry shoulder, the requirements to ensure a straight line, beautiful, hook, top to sand slurry surface, the road surface by paved gravel, gravel thickness of 0.10m.<br>(4) Renovation of field roads: the original road leveling, the road paved gravel, thickness of 0.15m.<br>6. Other ancillary engineering standards.<br>Cross-sectional culverts, gates, cisterns, falling water, wrong lanes, turning points, ramps and other ancillary facilities, according to the site construction needs and design standards for construction.
正在翻译中..