28 and 19 displacement calculation points are arranged on the slope and drain platform, 18 shear incremental increments (SSRs) are arranged in the same distance on the substrate, and they are numbered separately, the displacement calculation points are numbered with ID numbers, the SSR calculation units are numbered by No, the blue points in Figure 10 are displacement calculation points, and the red points are SSR computing units
正在翻译中..