1. The 1pc that has completed the ICT test arranges to solder the LCD, connect the TAPE-C data cable to confirm whether the ICT download is abnormal, and whether the LCD is lit, to prevent poor batch downloads.
1. 1pc arrangement welding liquid crystal has been completed ICT test, connected to TAPE-C data line to confirm that ICT download is not abnormal, LCD has no lighting can be, to prevent batch download bad.
1. The 1pc which has completed the ICT test is arranged to weld the LCD. Connect the tape-c data line to confirm whether the ICT download is abnormal and whether the LCD is on, so as to prevent the batch download from being bad.<br>