1、G100+500、G100+900、G75+950、G114+150、G123+000、G148+850、G529+40已完工;2、皎漂的英语翻译

1、G100+500、G100+900、G75+950、G114+15

1、G100+500、G100+900、G75+950、G114+150、G123+000、G148+850、G529+40已完工;2、皎漂首站:对护坡拱形骨架钢筋及绑扎质量进行检查;对护坡顶部模板安装尺寸及标高进行复查;对混凝土浇筑进行了全程旁站;对护坡拱形骨架竖勒模板安装尺寸及标高进行复查;施工现场作业人员均佩戴安全帽;3、G116+000:排水沟浇筑完成,正在进行草袋木桩回填及钢筋石笼预制;现场监理巡视检查;4、G110+000:1#混凝土挡墙开始浇筑;浆砌石护面墙砌筑,现场监理巡视检查;5、G147+230:陡坡排水沟护底混凝土浇筑、草袋回填,现场监理旁站+巡视检查;6、G132+300:N2、N5、N7、N8、N9继续人工挖孔;N1钢筋笼绑扎、焊接;N1、N3井混凝土浇筑;1#淤土坝混凝土浇筑,现场监理旁站+巡视检查;7、G132+200:老桩桩间挡板浇筑完成62块;桩前钢管桩钻孔并下管、灌浆;33m的排导槽侧墙支模板;33m下方的排导槽侧墙钻孔、下钢管、灌浆;现场监理旁站+巡视检查;8、G147+000:草袋木桩回填土,现场监理巡视检查。 " "G424:对管线周围塌陷冲沟人工开挖及2:8水泥土回填的质量进行控制,现场旁站2:8水泥土拌合均匀、分层夯实;厡水渠延长段渠底M10浆砌石垫底、M10砂浆找平、C20砼支模及浇筑各环节的施工经监理检查合格,方可进行下个环节;伊江护岸:监督顶部截水墙混凝土浇筑过程,督促施工单位进行丁坝及护岸打桩工作。"
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1, G100 + 500, G100 + 900, G75 + 950, G114 + 150, G123 + 000, G148 + 850, G529 + 40 has been completed; <br>2, first stop Kyaukpyu: slope of the arch reinforcement skeleton and quality checks banding ; on top of the template installation dimensions slope and elevation for review; concrete pouring station was next to the full; for vertical slope Le arch skeleton template installation size and elevation for review; construction site workers were wearing safety helmets; <br>3, G116 + 000 : gutter pouring completed, ongoing straw stakes backfill and gabion prefabricated; site supervision visits to check; <br>4, G110 + 000: # 1 start pouring concrete retaining wall; masonry mortar rubble masonry retaining wall, on-site supervision visits inspection; <br>. 5, G147 + 230: steep gutter guard bottom pouring concrete, straw backfill, site supervision station next visits to check +; <br>. 6, G132 + 300: N2 of, N5, the N7, N8, N9 continue manual digging; Nl reinforced cage banding, welding; N1, N3 well concrete pouring; # 1 silt dam concrete pouring, site supervision station next visits to check +; <br>. 7, G132 + 200 is: between old pile complete pouring flap 62; steel before pILE and the tube bore grout; 33m discharge side of the guide groove Branch template; 33m drainage canal sidewall drilling below the lower pipe, grouting; + site supervision visits to check the next station; <br>8, G147 + 000: straw stakes backfill, site supervision visits to check. <br>" <br>" G424: around doing excavation line collapse and gullies 2: 8 by mass backfill soil cement is controlled airfield next 2: 8 soil cement mixing uniformly, hierarchical compaction; Yuan canal channel bottom section extended mortar M10 rock bottom, M10 mortar, C20 concrete formwork and pouring of all aspects of construction by the supervising inspection and approval before proceeding to the next link; <br>Ayeyawady River revetment: Monitoring top cut-off walls concrete pouring process, to urge the construction units groins and revetments piling work . "
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1, G100 plus 500, G100,900, G75-950, G114-150, G123-000, G148-850, G529-40 has been completed;<br>2, the first station: the slope arch skeleton steel and strap quality inspection, the top of the slope template installation size and elevation review, the concrete pouring of the entire side station, the slope arch skeleton vertical template installation size and elevation review, construction site workers are wearing hard hats;<br>3, G116-000: drainage ditch pouring completed, is in the process of grass bag pile backfilling and steel stone cage pre-fabricated;<br>4, G110,000:1 concrete retaining wall began pouring;<br>5, G147 and 230: steep slope drainage ditch bottom concrete pouring, straw bag backfilling, on-site supervision side station and inspection;<br>6, G132-300:N2, N5, N7, N8, N9 continue to dig artificial holes; N1 steel cage strapping, welding; N1, N3 well concrete pouring; 1 silt dam concrete pouring, on-site supervision side station and inspection;<br>7, G132-200: the old pile inter-stop bezel pouring completed 62 blocks; <br>8, G147,000: grass bag pile backfilling soil, on-site supervision inspection inspection. <br>" "G424: the quality of the collapse dutter around the pipeline and 2:8 water backfilling quality to control, the site side station 2:8 water and soil mix ingress uniform, layered solid;<br>can the next link be carried out; Yijiang bank protection: supervise the top of the water wall concrete pouring process, and urge the construction unit to carry out dingdam and shore piling work. "
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. G100 + 500, G100 + 900, G75 + 950, g114 + 150, g123 + 000, G148 + 850 and g529 + 40 have been completed;<br>2. Kyaukpyu initial station: check the reinforcement and binding quality of the arch skeleton of the slope protection; recheck the installation dimension and elevation of the formwork at the top of the slope protection; carry out the whole process of side station for the concrete pouring; recheck the installation dimension and elevation of the vertical formwork of the arch skeleton of the slope protection; all the construction site operators shall wear safety helmets;<br>3. G116 + 000: after the completion of drainage ditch pouring, straw bag wood pile backfilling and reinforcement gabion prefabrication are in progress; site supervision and inspection;<br>4. G110 + 000: 1 × concrete retaining wall starts to be poured; masonry of masonry face protection wall, site supervision and inspection;<br>5. G147 + 230: concrete pouring for bottom protection of steep slope drainage ditch, straw bag backfilling, site supervision side station + patrol inspection;<br>6. G132 + 300: N2, N5, N7, N8, N9 continue to dig holes manually; N1 reinforcement cage binding and welding; N1, N3 well concrete pouring; 1 × silt dam concrete pouring, on-site supervision site + patrol inspection;<br>7. G132 + 200: 62 pieces of baffle between old piles have been poured; steel pipe piles in front of piles have been drilled, lowered and grouted; 33m side wall formwork of drainage channel has been supported; 33m side wall of drainage channel has been drilled, lowered and grouted; site supervision side station + patrol inspection;<br>8. G147 + 000: straw bag wood pile backfill, site supervision inspection.<br>"<br>"G424: control the quality of manual excavation and 2:8 cement soil backfilling of the collapsed gullies around the pipeline, mix the 2:8 cement soil evenly and tamp it layer by layer at the site side station; the construction of M10 mortar masonry base, M10 mortar leveling, C20 concrete formwork support and pouring at each link of the extended channel bottom shall be qualified by the supervisor before the next link is carried out;<br>Yijiang revetment: supervise the concreting process of the top cutoff wall, and urge the construction company to pile the groyne and revetment. "<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: