1, G100 plus 500, G100,900, G75-950, G114-150, G123-000, G148-850, G529-40 has been completed;<br>2, the first station: the slope arch skeleton steel and strap quality inspection, the top of the slope template installation size and elevation review, the concrete pouring of the entire side station, the slope arch skeleton vertical template installation size and elevation review, construction site workers are wearing hard hats;<br>3, G116-000: drainage ditch pouring completed, is in the process of grass bag pile backfilling and steel stone cage pre-fabricated;<br>4, G110,000:1 concrete retaining wall began pouring;<br>5, G147 and 230: steep slope drainage ditch bottom concrete pouring, straw bag backfilling, on-site supervision side station and inspection;<br>6, G132-300:N2, N5, N7, N8, N9 continue to dig artificial holes; N1 steel cage strapping, welding; N1, N3 well concrete pouring; 1 silt dam concrete pouring, on-site supervision side station and inspection;<br>7, G132-200: the old pile inter-stop bezel pouring completed 62 blocks; <br>8, G147,000: grass bag pile backfilling soil, on-site supervision inspection inspection. <br>" "G424: the quality of the collapse dutter around the pipeline and 2:8 water backfilling quality to control, the site side station 2:8 water and soil mix ingress uniform, layered solid;<br>can the next link be carried out; Yijiang bank protection: supervise the top of the water wall concrete pouring process, and urge the construction unit to carry out dingdam and shore piling work. "
正在翻译中..