The production schedule shall be imported into MES system, and materials shall be issued and produced in advance according to the order of system scheduling, and products of the same capacity cannot be produced in batches before and after, so as to avoid the problems that the products of the same capacity cannot be cleaned up and the machine capacity test cannot eliminate.<br>
正在翻译中..