The technical plan is to study and solve the problems and hidden dangers of the power system of petrochemical enterprises, and propose methods, countermeasures and related countermeasures in a targeted and systematic manner. Including transformation basis, transformation scope, transformation objectives, feasibility demonstration, engineering conditions, construction schedule, product selection, scheme drawing design, wiring terminal drawing design, setting parameter list, inspection item and content design, list of communication addresses, etc. . This book focuses on the detailed description of the technical scheme of transformation. <br>The implementation plan is to guide the transformation project of the power system of the petrochemical enterprise, and make a comprehensive, specific and clear plan from the target requirements, work content, methods and work steps. Including work schedule, equipment and materials list, construction standards, quality and safety assurance measures, etc. 2) Transformation implementation process. <br>As the technical transformation plan involves a large area, high technical complexity, and difficult on-site implementation, it is necessary to strictly control the transformation design plan in accordance with the standard implementation specifications and procedures, reasonably arrange the on-site construction details, and minimize the on-site transformation Time and workload reduce implementation risks. The transformation plan and process are shown in the following table.
正在翻译中..