G100-500: The concrete wall construction waste has been cleaned up, completed rectification; G116: Cured bags of cement have been treated on the roadside, completed rectification. <br>" <br>No. There has been a lack of green vegetation on the G132-200, which was proposed last week, and construction waste has not been cleaned up. G132-300: The original excavator up and down the road vegetation greening is insufficient, some of the construction waste has not been cleaned up. <br>The problem has been corrected. G110: The wall that was washed out of the slope is being cleaned, there is a safety hazard in the blocking wall area, the slope of this area is still unstable, and additional care has been requested. At present, in accordance with the requirements of the Ministry of Supervision to carry out additional care, the construction unit is required to strengthen the reinforced slope face when the fence, slow down the wall foundation clean-up, reduce the slope of the earth and stone loss, take a gradual clean-up and gradual lygination, and always pay attention to slope changes, strengthen site safety management, to ensure construction safety. <br>During rainfall, it is strictly forbidden to carry out any construction activities on the slope. <br>G424, G529-40: Completely completed, no safety issues have occurred. Yijiang bank protection: has been completely completed, there are no security problems.
正在翻译中..