已全部完工,G114水工点的最下方部分草袋回填土被雨水冲毁,监理要求对冲毁部位进行整改。 1、G132+200:排导槽侧墙混凝土浇筑质量不合的英语翻译

已全部完工,G114水工点的最下方部分草袋回填土被雨水冲毁,监理要求对

已全部完工,G114水工点的最下方部分草袋回填土被雨水冲毁,监理要求对冲毁部位进行整改。 1、G132+200:排导槽侧墙混凝土浇筑质量不合格,槽底在浇筑前未进行清理,浇筑时的水泥用量不足,已下发监理通知单(详见照片);2、G132+200:抗滑桩桩间挡板回填土未进行夯实,部分出现开裂(详见照片);3、G132+300:排水沟浇筑质量不合格,部门出现麻面(详见照片)。 G110:挡墙泄水孔部分有堵塞、挡墙内预留钢筋数量不足(详见照片)
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Have been completed, the bottom part of the straw point G114 hydraulic backfill was destroyed by rain, washed away parts of the supervision requirements for rectification. <br>1, G132 + 200: discharge guide groove sidewall pouring concrete substandard quality, the groove bottom is not cleaned prior to pouring, the pouring time is less than the amount of cement, has issued notice supervision (see photo); <br>2, 200 is G132 + : anti-slide pile baffle between backfill compaction is not carried out, some cracking (see photograph); <br>3, G132 + 300: substandard quality gutter pouring, the department appears pockmarked face (see photo). <br>G110: retaining wall scuppers part of a blockage, insufficient number of reserve reinforced inner wall (see photo)
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
It has been completed, the bottom of the bottom part of the G114 waterwork site grass bag backfilling soil was washed away by rain, the supervisor asked the hedge dissection site for rectification.<br>1, G132 plus 200: the drain ingesting groove side wall concrete pouring quality is not qualified, the bottom of the groove before pouring did not clean up, pouring when the amount of cement is insufficient, has been issued supervision notice sheet (see photo);<br>2, G132 and 200: anti-slip pile between the bezel backfilling soil was not solidified, part of the cracking (see photo); <br>3, G132 and 300: drainage ditch pouring quality is not qualified, the department appeared hemp surface (see photo). G110: Blocked section of the barrier spillhole, insufficient number of retained steel bars in the retaining wall (see photo)
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
All of them have been completed. The bottom part of the straw bag backfill of g114 hydraulic construction site has been destroyed by rainwater. The Supervisor requires to rectify the destroyed part.<br>1. G132 + 200: the concrete pouring quality of the side wall of the drainage channel is unqualified, the bottom of the channel is not cleaned before pouring, and the cement consumption during pouring is insufficient, and the supervision notice has been issued (see the photo for details).<br>2. G132 + 200: the backfill of baffle between anti slide piles is not compacted, and some of them are cracked (see photo for details);<br>3. G132 + 300: the pouring quality of drainage ditch is unqualified, and the Department has pitted surface (see photo for details).<br>G110: the drain hole part of the retaining wall is blocked, and the number of reserved steel bars in the retaining wall is insufficient (see photo for details)<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: