It has been completed, the bottom of the bottom part of the G114 waterwork site grass bag backfilling soil was washed away by rain, the supervisor asked the hedge dissection site for rectification.<br>1, G132 plus 200: the drain ingesting groove side wall concrete pouring quality is not qualified, the bottom of the groove before pouring did not clean up, pouring when the amount of cement is insufficient, has been issued supervision notice sheet (see photo);<br>2, G132 and 200: anti-slip pile between the bezel backfilling soil was not solidified, part of the cracking (see photo); <br>3, G132 and 300: drainage ditch pouring quality is not qualified, the department appeared hemp surface (see photo). G110: Blocked section of the barrier spillhole, insufficient number of retained steel bars in the retaining wall (see photo)
正在翻译中..