According to the actual requirements of the operation, maintenance and overhaul of the power system of the petrochemical industry, the system transformation plan and implementation follow the following principles: The principle of technological progress. The transformation is based on the <br>basic principles of improving the technical level of equipment, innovating the operation and management mode of the electrical system, improving the efficiency of production management, and saving energy and reducing consumption. The principle of starting from reality. The transformation adopts technical solutions that are not only suitable for the actual situation of the enterprise, but also can bring good economic benefits. The principle of saving money. The transformation aims at the transformation of the weak links of the power supply system, and uses the limited funds where they are most needed to improve the <br>effective utilization of funds . The principle of full participation. The transformation aims at the common problems in the power system of domestic petrochemical enterprises, mobilizes the enthusiasm of all parties, and fully absorbs the opinions and needs of operators on duty, maintenance personnel, enterprise managers and plan designers to ensure that the solutions are extensive And effectiveness.
正在翻译中..